Emma Hardy corrected the Commons record on Draft Flood Reinsurance (Amendment) Regulations 2025
Emma Hardy made the correction and printed in Hansard's Written Corrections on 27 February 2025. The correction replaced 1 figure (£140 million) with 2 figures (0 million, £1). Altogether 4 words differ between the two versions.
Original and corrected words
Struck through: original only. Bold: correction only.
| Original | Corrected |
|---|---|
| By using existing capital, Flood Re Ltd is keeping the increase to 18%, while its reinsurance costs are expected to more than double. The reduction from | By using existing capital, Flood Re Ltd is keeping the increase to 18%, while its reinsurance costs are expected to more than double. The reduction from £1 8 0 million a year to £135 million a year three years ago also demonstrates Flood Re Ltd’s commitment to its responsibility for keeping the levy as low as possible. |
More on Emma Hardy.
Receipt
| Read from | https://hansard-api.parliament.uk/debates/debate/112BB598-BA93-4395-A27A-B2125575D13A.json |
|---|---|
| Date read | 15 October 2026 |
| SHA-256 | a1f5a3fea8a8854288c827bae1b603b9d71bed1e8b68aa38bbfe31d9ab82fb5a |